Makkekadavu-Nerekadavu bridge across the Vembanad backwaters opens, linking Alappuzha to Kottayam
18 October 2026
Chief Minister V.D. Satheesan inaugurated the Makkekadavu-Nerekadavu bridge at 9 am on Sunday, 18 October 2026, with Public Works Minister P.K. Basheer presiding.
The bridge cost 98.09 crore and runs about 800 metres across the Vembanad backwaters, with pedestrian walkways on both sides.
It connects Makkekadavu in Thycattusserry panchayat in Alappuzha district on the western bank with Nerekadavu in Udayanapuram panchayat in Kottayam district on the eastern bank.
The structure was built with State funds; construction had crossed 90 per cent by May 2026, when the remaining approach road work was pending.
The crossing had earlier depended on water transport between the two banks.