Mettur Dam opened for Cauvery delta samba irrigation, 45-day release under way
1 September 2026
The Mettur Dam release that began on 1 September 2026 is planned to run for 45 days, to mid-October 2026, depending on storage and inflow. Chief Minister C. Joseph Vijay released the water on 1 September. The dam stood at 91.56 feet against a full level of 120 feet, with storage of 54.45 tmc ft. The delta districts of Thanjavur, Thiruvarur, Nagapattinam and Mayiladuthurai depend on the water for samba cultivation.
In plain words
tmc ft thousand million cubic feet — A unit used to measure reservoir storage in southern India.
Samba Samba paddy season — The main paddy crop of Tamil Nadu's Cauvery delta, sown after the Kuruvai season.