Sela Tunnel, built at 13,000 feet for Rs 825 crore, gives Tawang all-weather road access
17 October 2026
The Prime Minister virtually dedicated the Sela Tunnel to the nation from Itanagar on 9 March 2024, during the Viksit Bharat Viksit North East programme.
The tunnel was built by the Border Roads Organisation at a cost of Rs 825 crore and lies at an altitude of 13,000 feet.
It is on the Balipara-Chariduar-Tawang Road, which runs across the Sela Pass, and it is located in West Kameng district of Arunachal Pradesh.
The tunnel connects Tezpur in Assam to Tawang in Arunachal Pradesh.
It was built using the New Austrian Tunnelling Method, with the foundation stone laid on 9 February 2019 and construction beginning on 1 April 2019.
Chief Minister Pema Khandu and Union Minister Kiren Rijiju were present at the ceremony.
In plain words
BRO Border Roads Organisation — The body that builds and maintains roads in India's border areas, under the Ministry of Defence.
NATM New Austrian Tunnelling Method — A tunnelling technique that uses the surrounding rock itself as part of the support structure.